No fixed sprints — a continuous flow. A board with columns (To Do → In Progress → Done). WIP limits (Work In Progress) — a maximum of N tasks simultaneously "in progress". More flexible than Scrum.
Agile is about adapting to change, not about chaos. Planning happens, but the horizon is shorter and the plan is easier to change.